Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.
In this example, the bund is intended to store stormwater in the valley. The engineers first establish the proposed bund's location and determine the anticipated high flood level. Using leveling instruments, they identify and mark points corresponding to this water level along the valley upstream of the bund site. These points help create a visual representation of the capacity contours, which reveal how far the water will spread at the designated height.
In this analysis, the initial proposed bund height caused the water to encroach on a nearby dwelling area, posing a significant flood risk. Recognizing this, the engineers adjusted the bund height, lowering it to a level where the water stayed a safe distance from the residential zone. This process of recalculating and rechecking capacity contours ensures the bund's design mitigates flood risks effectively.
By integrating topographical assessments with safety considerations, the capacity contour method helps engineers design sustainable water management solutions that prioritize community safety and environmental integrity.
Del capítulo 27:
Now Playing
Traverse and Topographic Surveying
31 Vistas
Traverse and Topographic Surveying
37 Vistas
Traverse and Topographic Surveying
27 Vistas
Traverse and Topographic Surveying
35 Vistas
Traverse and Topographic Surveying
53 Vistas
Traverse and Topographic Surveying
24 Vistas
Traverse and Topographic Surveying
34 Vistas
Traverse and Topographic Surveying
27 Vistas
Traverse and Topographic Surveying
31 Vistas
ACERCA DE JoVE
Copyright © 2025 MyJoVE Corporation. Todos los derechos reservados