To begin, connect all the modules and pumps. Ensure the water flows circularly over the system for a minimum of 30 minutes. Inspect all the seams for potential leaks.
After conducting the tightness test, evacuate and dry the water inside. Then, load the appropriate contents in the modules. Fix the modules onto the baseboard using the screws and connect the inner circulation modules to the outer circulation modules.
Then, inject the seawater into the water inlet of the seawater store module. Once the water level reaches three centimeters above the water inlets of the pumps, switch them on and continue injecting the seawater. Now, turn on all the switches and set the seawater pump voltages to nine volts.
Set the water temperature to 25 degrees Celsius. Next, set the cycle timer to one minute on and one minute off. Set all three channels of the three-channel timer to 9:00 a.m.
on and 5:00 p.m.off.