9.2K Views
•
08:49 min
•
December 21st, 2019
DOI :
December 21st, 2019
•0:04
Title
0:52
Thermocouple Cable Preparation
2:09
Soil Moisture Cable Preparation
3:58
Sensor Head Terminal Strip Modification
4:35
Sensor Head Assembly
6:28
Results: Representative Sensor Calibrations and Temperature and Gravimetric Water Content (GWC) Measurements
7:47
Conclusion
Related Videos
11.4K Views
10.6K Views
49.3K Views
11.7K Views
15.7K Views
12.4K Views
12.3K Views
6.7K Views
4.6K Views
12.9K Views
Copyright © 2025 MyJoVE Corporation. All rights reserved