8.2 : Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard capacity require at least 1 minute, with an increment of 15 seconds for each additional cubic yard. It is also crucial to consider the mixer type, its rotation speed, and the quality of blending during charging when determining optimal mixing times. While standard mixers often require a mixing time of not less than 1 to 1.5 minutes, modern mixers are effective with shorter periods. If lightweight aggregate is used, the mixing duration should not fall below 5 minutes, and for air-entrained concrete, it should be at least 2 or 3 minutes. Prolonged mixing can lead to water evaporation, changes in aggregate grading, workability reduction, increased temperature, and, for air-entrained concrete, a decrease in air content.

Tags

Mixing TimeUniform Concrete MixConcrete StrengthMixer CapacityWater AdditionMixing PeriodMixer TypeRotation SpeedBlending QualityLightweight AggregateAir entrained ConcreteWorkability ReductionWater Evaporation

Dal capitolo 8:

article

Now Playing

8.2 : Mixing Time

Mixing, Placing and Curing Concrete

123 Visualizzazioni

article

8.1 : Mixing Concrete

Mixing, Placing and Curing Concrete

95 Visualizzazioni

article

8.3 : Ready Mixed Concrete

Mixing, Placing and Curing Concrete

69 Visualizzazioni

article

8.4 : Pumped Concrete

Mixing, Placing and Curing Concrete

55 Visualizzazioni

article

8.5 : Placing Concrete

Mixing, Placing and Curing Concrete

65 Visualizzazioni

article

8.6 : Vibrating Concrete

Mixing, Placing and Curing Concrete

65 Visualizzazioni

article

8.7 : Shotcrete

Mixing, Placing and Curing Concrete

43 Visualizzazioni

article

8.8 : Preplaced Aggregate Concrete

Mixing, Placing and Curing Concrete

88 Visualizzazioni

article

8.9 : Finishing Concrete

Mixing, Placing and Curing Concrete

72 Visualizzazioni

article

8.10 : Curing of Concrete

Mixing, Placing and Curing Concrete

81 Visualizzazioni

article

8.11 : Curing Methods

Mixing, Placing and Curing Concrete

64 Visualizzazioni

article

8.12 : Accelerated Curing of Concrete

Mixing, Placing and Curing Concrete

85 Visualizzazioni

JoVE Logo

Riservatezza

Condizioni di utilizzo

Politiche

Ricerca

Didattica

CHI SIAMO

Copyright © 2025 MyJoVE Corporation. Tutti i diritti riservati