13.4K Views
•
09:30 min
•
April 18th, 2020
DOI :
April 18th, 2020
•0:00
Introduction
1:35
Adjust the Moisture Content of the Plant Biomass
2:08
Load and Assemble the Reactor
2:47
Setup the Reactor System and Load the Ammonia Transfer Cylinder
4:13
Preheat the Reactor (for Temperatures > 100°C)
4:35
Load the Reactor with Ammonia
6:00
Begin Heating and Monitor the Reaction
6:39
Shut Down the System
7:11
Results
8:30
Conclusion
Related Videos
16.4K Views
9.9K Views
17.9K Views
7.2K Views
13.3K Views
11.1K Views
32.1K Views
6.3K Views
3.8K Views
6.5K Views
Copyright © 2025 MyJoVE Corporation. All rights reserved