JoVE Logo
Faculty Resource Center

Sign In

Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner

DOI :

10.3791/56112-v

October 25th, 2017

October 25th, 2017

7,696 Views

1Combustion and CCS Centre, Cranfield University

This manuscript describes a procedure for operating a calcium looping pilot-plant for post-combustion carbon capture with high oxygen concentrations in the calciner in order to reduce or eliminate the flue gas recycle.

Tags

Calcium Looping

-- Views

Related Videos

article

Determination of Microbial Extracellular Enzyme Activity in Waters, Soils, and Sediments using High Throughput Microplate Assays

article

Optimized Negative Staining: a High-throughput Protocol for Examining Small and Asymmetric Protein Structure by Electron Microscopy

article

A Simple Approach to Manipulate Dissolved Oxygen for Animal Behavior Observations

article

Methods of Soil Resampling to Monitor Changes in the Chemical Concentrations of Forest Soils

article

Measuring and Mapping Patterns of Soil Erosion and Deposition Related to Soil Carbonate Concentrations Under Agricultural Management

article

The Plant Infection Test: Spray and Wound-Mediated Inoculation with the Plant Pathogen Magnaporthe Grisea

article

High-throughput, Microscale Protocol for the Analysis of Processing Parameters and Nutritional Qualities in Maize (Zea mays L.)

article

Sampling, Sorting, and Characterizing Microplastics in Aquatic Environments with High Suspended Sediment Loads and Large Floating Debris

article

Preparation of Biomass-based Mesoporous Carbon with Higher Nitrogen-/Oxygen-chelating Adsorption for Cu(II) Through Microwave Pre-Pyrolysis

article

Composition and Distribution Analysis of Bioaerosols Under Different Environmental Conditions

JoVE Logo

Privacy

Terms of Use

Policies

Research

Education

ABOUT JoVE

Copyright © 2024 MyJoVE Corporation. All rights reserved